PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Interior electrical at the 2nd floor Facing East.jpg Stone panels at the South Elevation.jpg Door frames at the 3rd floor Waiting Area 352 Facing North.jpg Installing door frames at the 3rd floor Facing South.jpg Installing duct work at the 4th floor Facing West.jpg Installing ductwork at the 4th floor Facing South.jpg Installing sheating along the parapet of the High Roof Facing East.jpg Interior electrical at the 2nd floor Facing East (2).jpg Laying out block along 2nd floor column line H between 5-3.3 Facing East.jpg
Previous pageNext page Installing duct work at the 4th floor Facing West
Installing duct work at the 4th floor Facing West